sea level, it is the elevation than a field have reec with the sea level, field, it is the main part where we are going to contruct the road, horizontal alignment, it is the route that the road should to follow without change the elevation or the sea level in the plane, vertical alignment, that is the curves than a route should to follow for a while, and it change the elevation of the field where we are going to construct the road, pile, it is a fundation than we use in a bridge, a house or build, this element ir bigger than a piling, foundations, it is one of the most important parts of a construction of a build or road, it is going down the earth, BIM, building information modeling, concrete, it is the combination of whather, sand, grave and cement, and we have to wait for a while, filter, it is something than take wather to take care of bae and sub base, ditch, it is a hole, volume, it is the unit of meditionin cubic meters, gang or squad, 4 black mans, excavator, it is a machine than we use to retirate earth from the field
0%
jm
Compartir
Compartir
Compartir
per en/la
Juanjaime7878
Editar continguts
Imprimir
Incrustar
Més
Assignacions
Tauler de classificació
Mostrar-ne més
Mostrar-ne menys
Aquesta taula de classificació és privada actualment. Fés clic a
Compartir
per fer-la públic.
El propietari del recurs ha inhabilitat aquesta taula de classificació.
Aquesta taula de classificació està inhabilitada perquè que les teves opcions són diferents a les del propietari del recurs.
Reverteix les opcions
Emparellar
és una plantilla de final obert. No genera puntuacions per a una taula de classificació.
Cal iniciar la sessió
Estil visual
Tipus de lletra
Subscripció obligatòria
Opcions
Canvia de fonament
Mostrar-ho tot
Apareixeran més formats a mesura que jugueu a l'activitat.
Resultats oberts
Copiar enllaç
Codi QR
Suprimir
Restaurar desada automàtica:
?