Short circuit is....., Line to Neutral/Line to earth, Unrequired high resistance is......, Loose or faulty connection, Puwer, Ensuring work equipment is fit for purpose, Risk assessment, Identify the hazards, IET test equipment compliance, GS38, No voltage detected, Dead supply, Low voltage, Loose joint/heavy load, Equipment maflunction, Faulty equipment, MCB tripping/Fuse blowing, Overload or short circuit, Arcing, Loose connection, SPD tripped, Power surge/lightning strike, Excess current, excessive mechanical loading, Low MΩ reading, Insulation breakdown, Signal fault, Wiring or software failure, Requires special precautions, Hazardous situations, First stage of Fault Finding, Identification of symptoms, Final stage of Fault Finding, Rectification, EAWR Regulation 14, Restrictions for live working, HASAWA Section 7, Employees responsibilities, IET Regs testing part, Part 6.
0%
Fault Finding
Share
Share
Share
by
Martinclift1
I-edit ang Content
I-Print kini
Embed
Uban pa
Assignments
Leaderboard
Show more
Show less
Kini nga leaderboard naka-pribado. Pag-klik sa
Share
aron himuon kini nga publiko.
Kini nga leaderboard gi-disable sa tag-iya sa resource.
Kini nga leaderboard gi-disable tungod ang imong mga kapilian lahi ra sa tag-iya sa resource.
I-revert ang mga Kapilian
Ang
Match up
usa ka open-ended nga template. Dili kini makamugna ug mga marka sa leaderboard.
Kinahanglan mag log in
Visual style
Fonts
Subscription required
Mga Option
I-switch ang template
Ipakita tanan
Daghang mga format ang mugawas samtang gidula nimo ang activity.
Open results
Copy link
QR code
Mag-delete
I-restore ang gi-autosave:
?