Cavity lintel, 150mm bearing , Concrete lintel, 100mm bearing, DPC, Stops rising damp, minimum 150mm above ground level, Partial fill insulation, Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation, Blown in at a later date, EWI insulation, Fitted on external leaf, Vertical damp course, Prevents ingress of damp up openings, Cavity tray, Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes, Allows moisture to leave the cavity, DPM, Stops damp rising through the floor, Wall ties, 450mm x 900mm spacings, Expansion wall ties, Allows movement on long lengths of masonry, Restraint straps, Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate, Spreads the weight of the roof down the masonry, Gable end, , Proprietary wall starters, Where new masonry is attached to old masonry., Air bricks, Allows air flow to enter the build, Architects drawings and specification, Where we can find information on components, Window sill, Direct water to outer leaf under a window., Full-fill insulation, Allows air flow through the fibres. , Cavity closer, Seals cavity at an opening. .
0%
Walling components
Share
Share
Share
by
Stephenbull
Workplace
Construction
I-edit ang Content
I-Print kini
Embed
Uban pa
Assignments
Leaderboard
Show more
Show less
Kini nga leaderboard naka-pribado. Pag-klik sa
Share
aron himuon kini nga publiko.
Kini nga leaderboard gi-disable sa tag-iya sa resource.
Kini nga leaderboard gi-disable tungod ang imong mga kapilian lahi ra sa tag-iya sa resource.
I-revert ang mga Kapilian
Ang
Balloon pop
usa ka open-ended nga template. Dili kini makamugna ug mga marka sa leaderboard.
Kinahanglan mag log in
Visual style
Fonts
Subscription required
Mga Option
I-switch ang template
Ipakita tanan
Daghang mga format ang mugawas samtang gidula nimo ang activity.
)
Open results
Copy link
QR code
Mag-delete
I-restore ang gi-autosave:
?