Direct Changeover, Instant switch from old to new, Lowest cost but highest risk, Some downtime while systems switch, Testing must be rigorous, Parallel Running, Old and new system run together, Data entered into both, Safest but most expensive and time consuming method, Pilot Running, Used/tested in one area first e.g. one hotel, Rolled out after successful testing, Only one area affected, Small-group training first which can be used across all areas inhouse later, Phased Implementation, Introduced in stages, Gradual staff training and adaptation, Only failed phase needs testing and fixing, Compatibility concerns

BTEC: Implementation methods

Visueller Stil

Alle anzeigen

Aktivitätseinstellungen

Bestenliste

KI-Verbessert: Diese Aktivität enthält Inhalte, die von KI generiert werden. Weitere Informationen.

Vorlage ändern

Soll die automatisch gespeicherte Aktivität wiederhergestellt werden?