What does CSHP stand for?, Control Safety and Health Policy, Construction Site Hazard Prevention, Contractor’s Safety and Highway Plan, Construction Safety and Health Program, Which government agency enforces occupational safety and health standards in the workplace?, DPWH, DOLE, PRC, DILG, What does PPE mean?, Personal Protective Equipment, Public Protection Equipment, Project Planning Equipment, Preventive Protection Engineering, A road with traffic approach speed between 60 kph and 80 kph is called a:, Very High-Speed Road, Low Speed Road, High Speed Road, Low Volume Road, A road section with traffic approach speed greater than 80 kph is classified as:, Low Speed Road, Very High-Speed Road, High Volume Road, High Speed Road, A road accommodating 1,500 or more vehicles per day is known as a:, Low Volume Road, Short Term Road, High Volume Road, Low Speed Road, Which of the following describes Long Term Works?, Works done only by administration, Works that do not need signage overnight, Works completed within a day, Works taking longer than a day and need signage overnight, Short Term Works are works that:, Are completed within a day, Take longer than one week, Require overnight signage, Are only for bridge construction projects, What is the purpose of Road Works Traffic Control?, To stop all vehicles permanently, To remove all road signs during construction, To increase traffic congestion, To direct vehicles and pedestrians safely around a construction zone, Temporary signage is installed to:, Decorate the construction area, Replace permanent traffic laws, Warn, inform, and control workers and the public, Block all pedestrians from using the road, A Traffic Management Plan is:, A site-specific plan showing worksite layout, signs, devices, and safety guidance, A plan for buying construction materials, A financial report for road construction, A general list of workers assigned to the project, Every construction project shall have a suitable:, Traffic Violation Report, Construction Safety and Health Program, Vehicle Registration Form, Road Closure Permit only, During bidding, the contractor’s proposed CSHP shall be submitted as part of the:, Final billing documents, Project completion report, First envelope or Technical Proposal, Second envelope or Financial Proposal, According to the approval process, DOLE Regional Offices shall approve or disapprove the proposed CSHP within:, 3 days, 5 days, 10 days, 15 days, Who are authorized to approve the CSHP under DPWH D.O. 129, S. 2014?, All project laborers, All suppliers, All traffic enforcers, All HOPEs, Which of the following is NOT one of the Five C’s for good signage and markings?, Colorful, Consistent, Credible, Clear, The Temporary Traffic Control Zone is the area where road user conditions are changed due to:, Road celebration only, Weather only, Work zone or incident, Vehicle parking only, The area where road users are informed about the upcoming work zone is called the:, Adjacent Clearance Area, Work Activity Area, Termination Area, Advance Warning Area, The area where drivers are redirected out of their normal path of travel is called the:, Work Area, Transition Area, Storage Area, Termination Area, The Termination Area is the area where:, Traffic resumes normal operations after passing the worksite, Workers store equipment, Drivers are redirected to another lane, Warning signs are first installed, What is the main purpose of Article 162 of P.D. 442 or the Labor Code of the Philippines?, To regulate traffic signs only, To approve road construction designs, To set and enforce occupational safety and health standards, To issue vehicle permits, The Occupational Safety and Health Standards or OSHS contain rules that help:, Replace the role of engineers, Eliminate or reduce workplace hazards, Increase construction expenses, Remove all traffic control devices, RA 11058 aims to strengthen compliance with:, Vehicle registration standards, School curriculum standards, Building color requirements, Occupational Safety and Health Standards, DPWH D.O. 13, S. 2018 provides guidelines for cost estimates related to:, Traffic management and safety and health requirements, School tuition fees, Purchase of private vehicles, Salary increases of workers, A Construction Safety and Health Program contains detailed rules for:, Processes and safety practices in a construction project site, Road naming procedures, Project entertainment activities, Hiring office staff only, The approved CSHP duly received by DOLE is required before processing:, Vehicle renewal application, Final examination results, Student enrollment forms, Advance payment or first billing, If a CSHP application remains unacted upon on the 6th day after the five-working-day processing time, it shall be considered:, Rejected, Returned to the contractor, Approved, Cancelled, Which of the following is a principle of worksite traffic management?, Signs must remain even when no longer needed, Signs must be checked regularly for effectiveness, Signs must be erected only after work is finished, Signs must be hidden from road users, The Approach Clearance Area for Workers is generally how long?, 5 to 10 meters, 20 to 30 meters, 10 to 15 meters, 50 to 60 meters, The Work or Activity Area is the place where:, Road users are redirected to another lane, Drivers receive advance warning, Traffic returns to normal flow, Construction work is physically being carried out.

Tabla de clasificación

Estilo visual

Opciones

IA Mejorada: Esta actividad contiene contenido generado por IA. Aprende más.

Cambiar plantilla

¿Restaurar actividad almacenada automáticamente: ?