1️⃣ The hydraulic pump overheated during the taxi phase., A costly repair was needed., 2️⃣ The maintenance team forgot to calibrate the torque wrench., The component warranty became invalid., 3️⃣ The software update was postponed until after the test flight., The company received a safety warning from authorities., 4️⃣ A junior engineer misread the fuel temperature indicator., The captain reported an unusual noise during climb., 5️⃣ The parts shipment arrived two days late., The schedule for the next day was disrupted., 6️⃣ The oil filter wasn’t replaced after the last service check., The flight had to be cancelled., 7️⃣ The team ignored a minor vibration in the left engine., The aircraft stayed on the ground for eight extra hours., 8️⃣ The sensor data wasn’t backed up before the system reboot., The team had to work overtime to fix the issue., 9️⃣ The flight-data log wasn’t reviewed by the night shift., The client lost confidence in the maintenance quality., 🔟 The ground crew skipped one checklist step., The passengers experienced a long delay., 1️⃣1️⃣ Communication between flight crew and maintenance was unclear., A replacement aircraft had to be used., 1️⃣2️⃣ The engineer stayed home sick, and nobody took over the inspection.1️⃣, Everything eventually worked, but stress levels were high..
0%
Third conditional Speaking
Jaga
Jaga
Jaga
looja
Imaksymchuk97
Redigeeri sisu
Prindi
Manusta
Veel
Ülesandeid
Edetabel
Näita rohkem
Näita vähem
See edetabel on praegu privaatne. Selle avalikustamiseks klõpsake käsul
Jaga
.
Materjali omanik on selle edetabeli keelanud.
See edetabel on keelatud, kuna teie valikud erinevad materjali omaniku omadest.
Taasta valikud
Paaripanek
on avatud mall. Sellega ei saa edetabeli punkte.
Sisselogimine on nõutud
Visuaalne stiil
Fondid
Vajalik tellimus
Valikud
Vaheta malli
Näita kõike
Tegevust mängides kuvatakse rohkem vorminguid.
)
Avatud tulemused
Kopeeri link
QR-kood
Kustuta
Kas taastada automaatselt salvestatud
?