What does SMART target stand for - Specific, Measurable, Achievable, Realistic, Timely, What is a Project? - A project is a problem scheduled for solution, The process of risk management is designed to? - Identify risks, Assess their severity and likelihood, Avoid the risks if possible, Prevent risks turning into problems that affect the success of a project, Why is R&D important? - To keep up and improve a project to extract its maximum , What is Kaizen - A Japanese term meaning to change for the better or continuous improvement, Name a potential project constraint - Time, Budget, Work space, H/S, Location, Logistics, Equipment, Environment, Permission, What does a Matrix system look like?, What is an example of technological development - Candle --> Gas Light --> Light Bulb --> LED,
0%
Project Management
Jaga
Jaga
Jaga
looja
U20lmallett
Redigeeri sisu
Prindi
Manusta
Veel
Ülesandeid
Edetabel
Õpikaardid
on avatud mall. Sellega ei saa edetabeli punkte.
Sisselogimine on nõutud
Visuaalne stiil
Fondid
Vajalik tellimus
Valikud
Vaheta malli
Näita kõike
Tegevust mängides kuvatakse rohkem vorminguid.
Avatud tulemused
Kopeeri link
QR-kood
Kustuta
Kas taastada automaatselt salvestatud
?