The plans compare Port Harbour in 2000 with its current layout., Overall, the harbour has become more developed and tourist-oriented., Several new facilities have been added, while some older features have been replaced., The most notable change is the construction of a hotel on the eastern side., In 2000, a disused castle occupied the eastern peninsula., Today, this structure has been replaced by a hotel., A private beach for hotel guests has also been created nearby., Another major change involves the central waterfront area., The former fishing boats section has been converted into cafés and shops., The dock has been expanded and can now accommodate more boats., Additional passenger ferries are also shown in the updated plan., By contrast, several facilities have remained unchanged., These include the public beach, marina, lifeboat station and road network., The showers and toilets are still located on the western side., The two car parks also remain in their original positions., Overall, the harbour now offers more services for visitors and tourists.
0%
C19T2W1
Partager
Partager
par
Kienlee273
Modifier le contenu
Imprimer
Incorporer
Plus
Affectations
Classement
Afficher plus
Afficher moins
Ce classement est actuellement privé. Cliquez sur
Partager
pour le rendre public.
Ce classement a été désactivé par le propriétaire de la ressource.
Ce classement est désactivé car vos options sont différentes pour le propriétaire de la ressource.
Rétablir les Options
Démêler
est un modèle à composition non limitée. Il ne génère pas de points pour un classement.
Connexion requise
Style visuel
Polices
Abonnement requis
Options
Changer de modèle
Afficher tout
Ouvrir les résultats
Copier le lien
Code QR
Supprimer
Restauration auto-sauvegardé :
?