We can’t anticipate every possible problem, We must stay within budget this month, They allocated more time for testing, We’re already behind schedule again, According to the plan, we finish Friday, She was slightly worried after the call, It’s supposed to be a minor issue, I’m very pleased with the outcome, Please bring me up to speed, Write it down, otherwise you’ll forget, It’s vital to finish this today, We had a slight setback yesterday, These figures aren’t fully accurate yet, We reached a major milestone today, So far, they haven’t replied to us, You look absolutely fabulous in that dress, We can fix this straightaway, The delay was beyond our control, The project needs some upfront planning, Let’s go ahead with the proposal
0%
Projects
શેર કરો
શેર કરો
Schastnayaolga9
દ્વારા
સામગ્રીમાં ફેરફાર કરો
સંગ્રહો
ગમ્યું
પ્રિન્ટ
એમ્બેડ
વધુ
સોંપણીઓ
લીડરબોર્ડ
વધુ બતાવો
ઓછું બતાવો
આ લીડરબોર્ડ હાલમાં ખાનગી છે. તેને સાર્વજનિક કરવા માટે
શેર
પર ક્લિક કરો.
આ લીડરબોર્ડને સ્ત્રોત નિર્માતા દ્વારા નિષ્ક્રિય કરવામાં આવ્યું છે.
આ લીડરબોર્ડ નિષ્ક્રિય છે કારણ કે તમારા વિકલ્પો સ્ત્રોત નિર્માતા કરતા અલગ છે.
વિકલ્પો પાછા લાવો
અંજમ્બલ
એ ઓપન-એન્ડેડ ટેમ્પલેટ છે. તે લીડરબોર્ડ માટે સ્કોર જનરેટ કરતું નથી.
લોગ-ઇન જરૂરી છે
દૃશ્યમાન શૈલી
ફોન્ટ્સ
સબસ્ક્રિપ્શન જરૂરી
વિકલ્પો
આના જેવું વધુ
FCE I3-I4 M3 Unit 8 Future time clauses - Finish the sentence
Trevora
દ્વારા
રેન્ડમ વ્હીલ
7
Have something done - by tenses
Englishvilleonline
દ્વારા
વાક્ય પૂર્ણ કરો
6
Present + Past + Future
Tunlao1908
દ્વારા
રેન્ડમ કાર્ડ્સ
7
Project 3 U5C Present Perfect or Past Simple
Hipavla
દ્વારા
સાચું અથવા ખોટું
8
Project 3 Unit 3A Past Continuous Speaking
Hipavla
દ્વારા
રેન્ડમ વ્હીલ
31
GG4: Revision of tenses
Malyapnaya
દ્વારા
ગૃપ ગોઠવણી
7
GG4: Tenses Revision
Malyapnaya
દ્વારા
ક્વિઝ
6
Present perfect Unit 5A Project 3
Lenagell
દ્વારા
મેચ અપ
8
એઆઈ ઉન્નત: આ પ્રવૃત્તિમાં એઆઈ દ્વારા ઉત્પાદિત સામગ્રી શામેલ છે.
વધુ શીખો.
ટેમ્પલેટ બદલો
બધું બતાવો
પરિણામો ખોલો
કડીની નકલ કરો
ક્યુઆર કોડ
કાઢી નાંખો
આપોઆપ સંગ્રહ થયેલ છે:
?