The plans compare Port Harbour in 2000 with its current layout., Overall, the harbour has become more developed and tourist-oriented., Several new facilities have been added, while some older features have been replaced., The most notable change is the construction of a hotel on the eastern side., In 2000, a disused castle occupied the eastern peninsula., Today, this structure has been replaced by a hotel., A private beach for hotel guests has also been created nearby., Another major change involves the central waterfront area., The former fishing boats section has been converted into cafés and shops., The dock has been expanded and can now accommodate more boats., Additional passenger ferries are also shown in the updated plan., By contrast, several facilities have remained unchanged., These include the public beach, marina, lifeboat station and road network., The showers and toilets are still located on the western side., The two car parks also remain in their original positions., Overall, the harbour now offers more services for visitors and tourists.
0%
C19T2W1
שתף
שתף
על ידי
Kienlee273
עריכת תוכן
הדפסה
הטבעה
עוד
הקצאות
לוח תוצאות מובילות
הצג עוד
הצג פחות
לוח התוצאות הזה הוא כרגע פרטי. לחץ
שתף
כדי להפוך אותו לציבורי.
לוח תוצאות זה הפך ללא זמין על-ידי בעל המשאב.
לוח תוצאות זה אינו זמין מכיוון שהאפשרויות שלך שונות מאשר של בעל המשאב.
אפשרויות חזרה
בטל את הערבוב
היא תבנית פתוחה. זה לא יוצר ציונים עבור לוח התוצאות.
נדרשת כניסה
סגנון חזותי
גופנים
נדרש מנוי
אפשרויות
החלף תבנית
הצג הכל
תוצאות פתוחות
העתק קישור
קוד QR
מחיקה
האם לשחזר את הנתונים שנשמרו באופן אוטומטי:
?