1) Which stage marks the beginning of the project? a) Initiation b) Planning c) Deciding on the project d) Closing out the previous project 2) What are the advantages of the monitoring and controlling stage? a) The monitoring and controlling stage happens along with the execution phase and is used to check the project performance b) It is required to close out the project and hence happens before the closure phase c) The monitoring and controlling stage can be skipped in some instances d) The monitoring and controlling stage is the same as execution stage. 3) Ideally, what are the number of stages in the project lifecycle? a) It depends on the complexity of the project. b) Always all projects need to have 5 stages c) Lean Start Up has mostly just 3 stages d) The monitoring and Controlling phase can be skipped.
0%
Project
שתף
שתף
שתף
על ידי
Bbejja84
עריכת תוכן
הדפסה
הטבעה
עוד
הקצאות
לוח תוצאות מובילות
הצג עוד
הצג פחות
לוח התוצאות הזה הוא כרגע פרטי. לחץ
שתף
כדי להפוך אותו לציבורי.
לוח תוצאות זה הפך ללא זמין על-ידי בעל המשאב.
לוח תוצאות זה אינו זמין מכיוון שהאפשרויות שלך שונות מאשר של בעל המשאב.
אפשרויות חזרה
חידון
היא תבנית פתוחה. זה לא יוצר ציונים עבור לוח התוצאות.
נדרשת כניסה
סגנון חזותי
גופנים
נדרש מנוי
אפשרויות
החלף תבנית
הצג הכל
תבניות נוספות יופיעו במהלך המשחק.
תוצאות פתוחות
העתק קישור
קוד QR
מחיקה
האם לשחזר את הנתונים שנשמרו באופן אוטומטי:
?