The first printed office ____ (complete). His Highness Sheikh Mohammed Bin Rashid al Maktoum opened the first fully functional printed office in May, 2016. Developers used a 3D printer measuring 20 feet high, 120 feet long and 400 feet wide with an automated robotic arm to layer the mixture of cement and special building materials. The final product is a 250-square foot office with an innovative floor plan that ____ (develop) to promote easier communication between different workplace teams. Not only does the 'office of the future' look sleek and modern, the technique saved 80% on construction costs. This is not the only 3D printing project that Dubai is working on. 3D printed laboratories in Dubai's solar park ____ (plan) by the Dubai Electricity and Water Authority (DEWA) to open in the near future. The hope is that by 2030 at least 25% of buildings in Dubai ____ (construct) using this technique. For now, the office demonstrates the commitment in the UAE to continuing to develop 3D printing. The goal is that by continuing to innovate the 3D printing field, the UAE ____ (give) the status of the global centre of 3D printing by the year 2030/
0%
12 General - Unit 5 - Lessons 5 - 6 - Passive Voice Gap Fill
שתף
על ידי
Rickysharpe9
الصف 12
עריכת תוכן
הטבעה
עוד
לוח תוצאות מובילות
הצג עוד
הצג פחות
לוח התוצאות הזה הוא כרגע פרטי. לחץ
שתף
כדי להפוך אותו לציבורי.
לוח תוצאות זה הפך ללא זמין על-ידי בעל המשאב.
לוח תוצאות זה אינו זמין מכיוון שהאפשרויות שלך שונות מאשר של בעל המשאב.
אפשרויות חזרה
השלם את המשפט
היא תבנית פתוחה. זה לא יוצר ציונים עבור לוח התוצאות.
נדרשת כניסה
סגנון חזותי
גופנים
נדרש מנוי
אפשרויות
החלף תבנית
הצג הכל
תבניות נוספות יופיעו במהלך המשחק.
תוצאות פתוחות
העתק קישור
קוד QR
מחיקה
האם לשחזר את הנתונים שנשמרו באופן אוטומטי:
?