Constraints: through housing joint to connect the frame together, clearance betwclearance between the bottom of the tealight to prevent overheating, free standing, hold tealights securely, stable, made from two different materials, completed in 6 weeks, Considerations: manufactured from pine, plywood and could include acrylic, shape the ends to create an interesting design, additional coloured materials to create interesting design, finish could be added, tealights in line or diagonal,

Tealight Constraints and Considerations

לוח תוצאות מובילות

סגנון חזותי

אפשרויות

החלף תבנית

האם לשחזר את הנתונים שנשמרו באופן אוטומטי: ?