1) The final phase of the project lifecycle, where the project is formally closed and evaluated, is called a) Closure b) Planning c) Execution d) Initiation 2) The phase in the project lifecycle where the project deliverables are created and completed is known as a) Closure b) Execution c) Initiation d) Planning 3) A flexible project management methodology that focuses on iterative progress and collaboration is called a) Lean b) PRINCE2 c) Agile d) Waterfall 4) A methodology that breaks down projects into small, manageable phases or stages is known as a) PRINCE2 b) Agile c) Scrum d) Waterfall 5) The first phase of the project lifecycle, where the project is defined and approved, is called a) Planning b) Initiation c) Execution d) Closure 6) The process of identifying, analysing, and responding to risks is called a) Risk Management b) Issue Management c) Scope Management d) Quality Management
0%
Unit 003 Project Management
שתף
שתף
שתף
על ידי
Irfaan
Adult education
Computing
עריכת תוכן
הדפסה
הטבעה
עוד
הקצאות
לוח תוצאות מובילות
הצג עוד
הצג פחות
לוח התוצאות הזה הוא כרגע פרטי. לחץ
שתף
כדי להפוך אותו לציבורי.
לוח תוצאות זה הפך ללא זמין על-ידי בעל המשאב.
לוח תוצאות זה אינו זמין מכיוון שהאפשרויות שלך שונות מאשר של בעל המשאב.
אפשרויות חזרה
חידון טלויזיה
היא תבנית פתוחה. זה לא יוצר ציונים עבור לוח התוצאות.
נדרשת כניסה
סגנון חזותי
גופנים
נדרש מנוי
אפשרויות
החלף תבנית
הצג הכל
תבניות נוספות יופיעו במהלך המשחק.
תוצאות פתוחות
העתק קישור
קוד QR
מחיקה
האם לשחזר את הנתונים שנשמרו באופן אוטומטי:
?