Dead Tests : continuity of protective conductors, including main and supplementary bonding, continuity of ring final circuit conductors, insulation resistance, Polarity , Earth Electrode resistance , Live Tests: protection by automatic disconnection of the supply, Earth fault loop impedance , Prospective fault current measurement , Phase rotation , Functional testing including RCD's and switchgear , Verification of Voltage Drop,

Testing Live or Dead?

द्वारा

लीडरबोर्ड

दृश्य शैली

विकल्प

टेम्पलेट स्विच करें

ऑटो-सेव पुनःस्थापित करें: ?