Mark the centre of wall measurements on the ground., Excavate trench/strip to the correct depth, Pour concrete into the trench., Install the reinforcement into the poured concrete., Ensure the concrete is level., Construct walls to DPC., Backfill as required..

Top-lista

Vizualni stil

Postavke

Promijeni predložak

Vrati automatski spremljeno: ?