If we had checked the model earlier, we ______ clashes on site., If engineers use BIM tools, they ______ coordination errors., If you finish the Revit model today, we ______ it to the client tomorrow., If I were better at Autodesk Revit, I ______ more complex structures., If a building is poorly designed, construction costs ______., If they had used BIM properly, the project ______ faster., If you change a parameter in Autodesk Revit, the model ______ automatically., If we didn’t use Autodesk Revit, coordination ______ much harder., If the engineer had updated the drawings, the team ______ that mistake., If the team detects clashes early, they ______ time during construction., If you don’t check clashes in Autodesk Revit, problems ______ on site., If the project had more budget, we ______ more advanced tools., If you improve the model, the project ______ more smoothly., If I had learned Autodesk Revit sooner, I ______ that job., If you worked as a BIM manager, you ______ all disciplines., If we follow the BIM workflow, we ______ many mistakes.
0%
REVIT
Bagikan
Bagikan
Bagikan
oleh
Spotschool
Edit Konten
Cetak
Menyematkan
Tambah
Tugas
Papan Peringkat
Tampilkan lainnya
Tampilkan lebih sedikit
Papan peringkat ini saat ini bersifat pribadi. Klik
Share
untuk menjadikannya publik.
Papan peringkat ini telah dinonaktifkan oleh pemilik sumber daya.
Papan peringkat ini dinonaktifkan karena opsi Anda berbeda dengan pemilik sumber daya.
Opsi Pemulihan
Kartu lampu kilat
adalah templat terbuka. Ini tidak menghasilkan skor untuk papan peringkat.
Diperlukan login
Gaya visual
Font
Diperlukan langganan
Pilihan
Berganti templat
Tampilkan semua
Format lainnya akan muncul saat Anda memainkan aktivitas.
)
Buka hasil
Salin tautan
Kode QR
Hapus
Pulihkan simpan otomatis:
?