Open the FDH enclosure and assess suitability according to project plan., Locate the next available slot in the splitter module area., Insert the splitter module into the slot., Secure the module according to manufacturer specifications., Inspect the installed splitter module and surrounding area for completeness., Locate the feeder port and remove the protective cover., Use an optical power meter to verify the feeder port is not active., Clean the adaptor and mated connector., Connect the input fibre to the feeder port., Record the connection according to organisational policy.

Sequence the Steps

Papan Peringkat

Gaya visual

Pilihan

AI Enhanced: Aktivitas ini berisi konten yang dihasilkan oleh AI. Pelajari lebih lanjut.

Berganti templat

Pulihkan simpan otomatis: ?