When selecting materials, what documents do we refer to? , Drawings and specifications, Method Statement, Risk Assessment, Programme of works, Why do we ensure correct ratio's when mixing? , It's British law. , The customer has asked for it, Ensure consistency throughout the build, We need to ensure our mix is weak, When cutting, what rule do we follow?, Cut - measure - mark, Mark - measure - cut, Mark - cut - measure, Measure - mark - cut, Where should materials be placed when mixing? , At the site entrance, Next to the mixing area, On the scaffold, Near the site boundary, Identify the tool used to find angles when cutting. , , , , , Identify the items of PPE that would give you the best protection when cutting with a masonry saw., Safety boots and hard hat, High Vis vest and visor, Safety goggles and ear defenders, Overalls and sunscreen, What should we do with our back when lifting materials?, Keep it bent, Keep it 90 degrees, Keep is 45 degrees, Keep it straight, Identify the main reason we should use lifting aids as much as possible. , Saves money, Avoiding manual handling, Insurance purposes, We have the training, Why should materials be stored just away from the trench edge?, To avoid trench collapse, So we have to walk to get them, To encourage stretching, To make it harder for us, When building a standard cavity wall, where would the blocks be loaded out to? , External side, Internal side, In the cavity, Below DPC, Identify the best reason why our working platforms are kept tidy, To make cleaning up easier, To avoid damage to brick face, To keep the customer happy, To avoid slips and trips, Where can spilled mortar end up when it splatters?, On the brickface, In the skip, On the customers head, On a public highway, Find the reason we cover all materials when not in use., To prevent theft, To prevent insect attack, To protect against inclement weather, To aid in building, When is the best time to install stone decorative features?, Before works commences , During the building process, After the building process, One week after the building process, Identify how we protect newly laid masonry from frost., Hessian, Polythene, Tarpaulin , Carpet, Identify how we protect newly laid masonry from rain, Hessian, Polythene, Carpet, Cardboard.
0%
Preparing materials
Bagikan
Bagikan
Bagikan
oleh
Stephenbull
Workplace
Construction
Edit Konten
Cetak
Menyematkan
Tambah
Tugas
Papan Peringkat
Tampilkan lainnya
Tampilkan lebih sedikit
Papan peringkat ini saat ini bersifat pribadi. Klik
Share
untuk menjadikannya publik.
Papan peringkat ini telah dinonaktifkan oleh pemilik sumber daya.
Papan peringkat ini dinonaktifkan karena opsi Anda berbeda dengan pemilik sumber daya.
Opsi Pemulihan
Membuka kotak
adalah templat terbuka. Ini tidak menghasilkan skor untuk papan peringkat.
Diperlukan login
Gaya visual
Font
Diperlukan langganan
Pilihan
Berganti templat
Tampilkan semua
Format lainnya akan muncul saat Anda memainkan aktivitas.
Buka hasil
Salin tautan
Kode QR
Hapus
Pulihkan simpan otomatis:
?