Cavity lintel - 150mm bearing , Concrete lintel - 100mm bearing, DPC - Stops rising damp, minimum 150mm above ground level, Partial fill insulation - Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation - Blown in at a later date, EWI insulation - Fitted on external leaf, Vertical damp course - Prevents ingress of damp up openings, Cavity tray - Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes - Allows moisture to leave the cavity, DPM - Stops damp rising through the floor, Wall ties - 450mm x 900mm spacings, Expansion wall ties - Allows movement on long lengths of masonry, Restraint straps - Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate - Spreads the weight of the roof down the masonry, Gable end, Proprietary wall starters - Where new masonry is attached to old masonry., Air bricks - Allows air flow to enter the build, Architects drawings and specification - Where we can find information on components, Window sill - Direct water to outer leaf under a window., Full-fill insulation - Allows air flow through the fibres. , Cavity closer - Seals cavity at an opening. ,
0%
Walling components
Bagikan
Bagikan
Bagikan
oleh
Stephenbull
Workplace
Construction
Edit Konten
Cetak
Menyematkan
Tambah
Tugas
Papan Peringkat
Tampilkan lainnya
Tampilkan lebih sedikit
Papan peringkat ini saat ini bersifat pribadi. Klik
Share
untuk menjadikannya publik.
Papan peringkat ini telah dinonaktifkan oleh pemilik sumber daya.
Papan peringkat ini dinonaktifkan karena opsi Anda berbeda dengan pemilik sumber daya.
Opsi Pemulihan
Pecah Balon
adalah templat terbuka. Ini tidak menghasilkan skor untuk papan peringkat.
Diperlukan login
Gaya visual
Font
Diperlukan langganan
Pilihan
Berganti templat
Tampilkan semua
Format lainnya akan muncul saat Anda memainkan aktivitas.
Buka hasil
Salin tautan
Kode QR
Hapus
Pulihkan simpan otomatis:
?