sea level, it is the elevation than a field have reec with the sea level, field, it is the main part where we are going to contruct the road, horizontal alignment, it is the route that the road should to follow without change the elevation or the sea level in the plane, vertical alignment, that is the curves than a route should to follow for a while, and it change the elevation of the field where we are going to construct the road, pile, it is a fundation than we use in a bridge, a house or build, this element ir bigger than a piling, foundations, it is one of the most important parts of a construction of a build or road, it is going down the earth, BIM, building information modeling, concrete, it is the combination of whather, sand, grave and cement, and we have to wait for a while, filter, it is something than take wather to take care of bae and sub base, ditch, it is a hole, volume, it is the unit of meditionin cubic meters, gang or squad, 4 black mans, excavator, it is a machine than we use to retirate earth from the field
0%
jm
Bagikan
Bagikan
Bagikan
oleh
Juanjaime7878
Edit Konten
Cetak
Menyematkan
Tambah
Tugas
Papan Peringkat
Tampilkan lainnya
Tampilkan lebih sedikit
Papan peringkat ini saat ini bersifat pribadi. Klik
Share
untuk menjadikannya publik.
Papan peringkat ini telah dinonaktifkan oleh pemilik sumber daya.
Papan peringkat ini dinonaktifkan karena opsi Anda berbeda dengan pemilik sumber daya.
Opsi Pemulihan
Permainan Pencocokan
adalah templat terbuka. Ini tidak menghasilkan skor untuk papan peringkat.
Diperlukan login
Gaya visual
Font
Diperlukan langganan
Pilihan
Berganti templat
Tampilkan semua
Format lainnya akan muncul saat Anda memainkan aktivitas.
Buka hasil
Salin tautan
Kode QR
Hapus
Pulihkan simpan otomatis:
?