Contractors'/Consultants Materials Engineer 1 can handle 1 project costing not more than ____., ₱100M, ₱150M, ₱200M, ₱250M, Contractors'/Consultants Materials Engineer 1 can handle 2 projects, with an aggregate cost of not more than ____., ₱150M, ₱200M, ₱250M, ₱300M, Contractors'/Consultants Materials Engineer 1 can handle 3 projects, with an aggregate cost of not more than ____., ₱200M, ₱250M, ₱300M, ₱350M, Non-accredited Contractors'/Consultants Materials Engineer may be assigned to ____ projects., 1, 2, 3, 4, Non-accredited Contractors'/Consultants Materials Engineer may be assigned to a certain number of projects, with an aggregate cost of ____ or below., ₱5.0M, ₱10.0M, ₱15.0M, ₱20.0M, Contractors'/Consultants Materials Engineer 2 can handle 2 projects, with an aggregate cost of not more than ____., No limit, ₱300M, ₱250M, ₱200M, Contractors'/Consultants Materials Engineer 2 can handle 1 project, with an aggregate cost of not more than ____., ₱200M, ₱250M, ₱300M, No Limit, Contractors'/Consultants Materials Engineer 2 can handle 3 projects, with an aggregate cost of not more than ____., ₱200M, ₱250M, ₱300M, ₱400M, What is the DPWH minimum testing requirement for "Concrete Cylinder"?, 1 set of 3 cylinders for 50 cu. m, 1 set of 3 cylinders for 75 cu. m, 1 set of 4 cylinders for 75 cu. m, 1 set of 4 cylinders for 50 cu. m, What is the DPWH minimum testing requirement for "Asphalt Mix"?, 15 kg per 130 Tonnes, 10 kg per 130 Tonnes, 20 kg per 130 Tonnes, 25 kg per 130 Tonnes, What is the DPWH minimum testing requirement for "Non-Reinforced Concrete Pipe"?, 3 pipes minimum or 0.5% of number of pipes, 1 pipe minimum or 0.5% of number of pipes, 4 pipes minimum or 0.5% of number of pipes, 2 pipes minimum or 0.5% of number of pipes, What is the DPWH minimum testing requirement for "Asphalt Material"?, 5 L per 40 Tonnes or 200 drums, 10 L per 40 Tonnes or 200 drums, 15 L per 40 Tonnes or 200 drums, 20 L per 40 Tonnes or 200 drums, What is the DPWH minimum testing requirement for "Steel Bars"?, 4 meters per 10,000 kg or 10 Tonnes, 3 meters per 10,000 kg or 10 Tonnes, 2 meters per 10,000 kg or 10 Tonnes, 1 meter per 10,000 kg or 10 Tonnes, What is the DPWH minimum testing requirement for "Paints"?, 1 L can/s per 100 cans, 2 L can/s per 100 cans, 3 L can/s per 100 cans, 4 L can/s per 100 cans, What is the DPWH minimum testing requirement for "Cement"?, 10 kg sample per 2,000 bags, 20 kg sample per 2,000 bags, 30 kg sample per 2,000 bags, 40 kg sample per 2,000 bags, What is the DPWH minimum testing requirement for "Concrete Core"?, 4 cores for every kilometer, 5 cores for every kilometer, 6 cores for every kilometer, 7 cores for every kilometer, What is the DPWH minimum testing requirement for "Wire-Strand Strap"?, 1 meter, 2 meters, 3 meters, 4 meters, What is the DPWH minimum testing requirement for "Galvanized Steel Pipe"?, (2 pcs of 100 mm long taken from both ends without thread) per 500 lengths, (2 pcs of 100 mm long taken from both ends without thread) per 400 lengths, (4 pcs of 100 mm long taken from both ends without thread) per 500 lengths, (4 pcs of 100 mm long taken from both ends without thread) per 400 lengths, What is the DPWH minimum testing requirement for "Curing Compound"?, 1 Liter/s, 2 Liter/s, 3 Liter/s, 4 Liter/s, What is the DPWH minimum testing requirement for "Soil Aggregate - for Classification"?, 20 kg per 1,500 cu. m, 30 kg per 1,500 cu. m, 40 kg per 1,500 cu. m, 50 kg per 1,500 cu. m, What is the DPWH minimum testing requirement for "Soil Aggregate - for Moisture Density Relation and CBR"?, 20 kg per 1,500 cu. m, 30 kg per 1,500 cu. m, 40 kg per 1,500 cu. m, 50 kg per 1,500 cu. m, What is the DPWH minimum testing requirement for "Soil Aggregate - for Routinary Test"?, 20 kg per 1,500 cu. m, 30 kg per 1,500 cu. m, 40 kg per 1,500 cu. m, 50 kg per 1,500 cu. m, What is the DPWH minimum testing requirement for "Concrete Beam"?, 2 beams (6" × 6" × 21") for 75 cu. m or 1 day pouring, 3 beams (6" × 6" × 21") for 75 cu. m or 1 day pouring, 4 beams (6" × 6" × 21") for 75 cu. m or 1 day pouring, 5 beams (6" × 6" × 21") for 75 cu. m or 1 day pouring, What is the DPWH minimum testing requirement for "Reinforced Concrete Pipe"?, 1 pipe per 50 pipes or 2% of number of pipes, 2 pipes per 50 pipes or 2% of number of pipes, 3 pipes per 50 pipes or 2% of number of pipes, 4 pipes per 50 pipes or 2% of number of pipes, What is the DPWH minimum testing requirement for "Joint Filler (Pre-mold)"?, 1 sample of 100 mm × 100 mm, 1 sample of 200 mm × 200 mm, 1 sample of 300 mm × 300 mm, 1 sample of 400 mm × 400 mm, What is the DPWH minimum testing requirement for "Gabion"?, 1 m × 1 m, 1 m × 2 m, 2 m × 2 m, 3 m × 3 m, What is the DPWH minimum testing requirement for "Asphalt Cores"?, 1 core/s for every 100 meters, 2 cores/s for every 100 meters, 3 cores/s for every 100 meters, 4 cores/s for every 100 meters, What is the DPWH minimum testing requirement for "Structural Steel/Sheet"?, 1 sample per 50 tonnes, 2 samples per 50 tonnes, 3 samples per 50 tonnes, 4 samples per 50 tonnes, What is the DPWH minimum testing requirement for "Water Analysis - for chemical analysis"?, 300 mL, 400 mL, 500 mL, 600 mL, What is the DPWH minimum testing requirement for "Water Analysis - for Sediment load"?, 300 mL, 400 mL, 500 mL, 600 mL, What is the DPWH minimum testing requirement for "Coarse Aggregates"?, 50 kg per 1,500 cu. m, 60 kg per 1,500 cu. m, 70 kg per 1,500 cu. m, 80 kg per 1,500 cu. m, What is the DPWH minimum testing requirement for "Fine Aggregates"?, 50 kg per 1,500 cu. m, 60 kg per 1,500 cu. m, 70 kg per 1,500 cu. m, 80 kg per 1,500 cu. m, What is the DPWH minimum testing requirement for "Galvanized Steel Sheet"?, 1 meter per 1,000 sheets, 2 meters per 1,000 sheets, 3 meters per 1,000 sheets, 4 meters per 1,000 sheets, What is the DPWH minimum testing requirement for "Concrete Hollow Blocks - for both Strength and Moisture Content test"?, 4 units (2 for each test) per 10,000 units, 6 units (3 for each test) per 10,000 units, 8 units (4 for each test) per 10,000 units, 10 units (5 for each test) per 10,000 units, For "Embankment Material", 1 set of test is needed for every _______ per source or fraction thereof., 500 m³, 1,000 m³, 2,000 m³, 3,000 m³, For "Embankment Material", 1 FDT test is needed for every _______ of each layer of compacted fill or fraction thereof, with at least 1 group of 3 in-situ density tests., 500 m², 1,000 m², 750 m², 1,500 m², For "Autoclave Aerated Concrete (AAC) blocks", 1 set of quality test is needed for every _______ units or fraction thereof., 10,000, 5,000, 3,000, 2,000, For "Concrete Hollow Blocks", for lots of more than 100,000 units, 1 set of quality test is needed per _______ units., 100,000, 50,000, 30,000, 10,000, For "Concrete Hollow Blocks", for lots of more than 10,000 units and less than 100,000 units, _____ set/s of quality test is needed., One (1), Two (2), Three (3), Four (4), Item 708, an admixture that accelerates the time of setting and early strength development of concrete., Type D, Type B, Type A, Type C, Item 708, an admixture that delays the time of setting of concrete., Type D, Type C, Type A, Type B, Item 708, an admixture that reduces the quantity of mixing water required to produce concrete of a given consistency., Type C, Type A, Type D, Type B, Item 708, an admixture that decreases the quantity of mixing water required to produce concrete of a given consistency by 12 percent or greater., Type A, Type D, Type C, Type B, In Item 311, Portland Cement, only _____ Portland Cement shall be used unless otherwise provided for in the Special Provisions., Type III, Type V, Type I, Type IV, In Item 311, fine aggregates shall not contain more than ____ mass percent of material passing the 0.075 mm (No. 200 sieve)., 2%, 3%, 4%, 1%, In Item 311, fine aggregates shall not contain more than ____ mass percent of each of clay lumps or shale., 4%, 2%, 3%, 1%, In Item 311, fine aggregates subjected to five (5) cycles of the sodium sulfate soundness test, the weighted loss shall not exceed ___ mass percent., 10%, 5%, 15%, 12%, In Item 311, fine aggregates subjected to the colorimetric test for organic impurities, if a color darker than the standard is produced:, It shall be subjected for adjustment., It shall be rejected., Insufficient information., It shall be accepted., In Item 311, coarse aggregates shall have a mass percent of wear not exceeding ___., 30%, 45%, 50%, 40%, In Item 311, coarse aggregates shall not have more than ___ mass percent of soft fragments., 3.5%, 1.5%, 1.0%, 3.0%, In Item 311, coarse aggregates shall contain not more than ___ mass percent of material passing the 0.075 mm (No. 200) sieve., 4%, 2%, 1%, 3%, In Item 311, coarse aggregates shall contain not more than ___ mass percent of clay lumps., 0.75%, 0.25%, 1.0%, 0.50%, In Item 311, coarse aggregates subjected to five (5) cycles of the sodium sulfate soundness test, the weighted loss shall not exceed ____ mass percent., 5%, 10%, 15%, 12%, In Item 311, coarse aggregates, if slag is used, its density shall not be less than ____ kg/m³., 1,120 kg/m³, 1,000 kg/m³, 1,240 kg/m³, 1,360 kg/m³, In Item 311, water used for the mix should have a pH value of ______., 6.5–10.5, 8.5–12.5, 4.5–8.5, 2.5–6.5, _______, if used, shall be transferred to elevated airtight and weatherproof bins., Masonry Cement, Pozzolan, Portland, Bulk Cement, In Item 311, Fly Ash, if specified or permitted as a mineral admixture and not exceeding ____ partial replacement of Portland Cement in the concrete mix, shall conform to the requirements of ASTM C618., 25%, 15%, 20%, 10%, In Item 311, storage buildings shall have capacity for storage of a sufficient quantity of cement to allow sampling at least ____ days before the cement is to be used., 12 days, 7 days, 10 days, 8 days, In Item 311, the Contractor shall prepare the design mix based on the _______ as outlined in the American Concrete Institute., Both methods, Absolute Volume Method, Absolute Weight Method, None of the above, In Item 311, at least ____ kg of cement per cubic meter of concrete is required to meet the minimum strength requirements., 364 kg/m³, 424 kg/m³, 384 kg/m³, 444 kg/m³, In Item 311, concrete shall have a slump of between _____ if not vibrated., 30–75 mm, 30–85 mm, 40–85 mm, 40–75 mm, In Item 311, concrete shall have a slump of between ______ if vibrated., 10–30 mm, 20–40 mm, 10–40 mm, 20–30 mm, In Item 311, flexural strength of not less than ___ MPa when tested by the third-point method., 8.3 MPa, 3.8 MPa, 4.5 MPa, 5.4 MPa, In Item 311, flexural strength of not less than ___ MPa when tested by the mid-point method., 8.3 MPa, 3.8 MPa, 4.5 MPa, 5.4 MPa, In Item 311, concrete shall have a compressive strength not less than ____ MPa for cores., 24.1 MPa, 20.1 MPa, 32.1 MPa, 28.1 MPa, In Item 311, form flange braces must extend outward on the base to not less than ___ the height of the form., 3/4, 1/3, 1/4, 2/3, In Item 311, forms shall not deviate from the true line by more than ___ cm at any point., 3 cm, 1 cm, 4 cm, 2 cm, In Item 311, stockpiles of aggregates, all washed aggregates and aggregates produced or handled by hydraulic methods, shall be stockpiled or binned for draining at least ____ hours before being batched., 24 hours, 18 hours, 10 hours, 12 hours, In Item 311, concrete mixed at the site or in a central mixing plant, the mixing time shall not be less than _____ seconds nor more than ____ seconds for drum-type mixers., 40 and 100, 40 and 90, 50 and 90, 50 and 100, In Item 311, the time elapsed from the time water is added to the mix until the concrete is deposited in place at the site shall not exceed forty-five (45) minutes when the concrete is hauled in non-agitating trucks, nor _______ minutes when hauled in truck mixers or truck agitators., 105 minutes, 90 minutes, 45 minutes, 60 minutes, In Item 311, retempering concrete by adding water or by other means shall not be permitted, except _____., When concrete is delivered in truck mixers, When concrete is delivered in non-agitating trucks, When the project is small, When the weather is cold, In Item 311, concrete not in place within _____ minutes from the time the ingredients were charged into the mixing drum or that has developed initial set shall not be used., 105 minutes, 80 minutes, 90 minutes, 65 minutes, In Item 311, in no case shall the vibrator be operated longer than ____ seconds in any one location., 45 seconds, 30 seconds, 60 seconds, 15 seconds, In Item 311, as work progresses, at least one (1) set consisting of three (3) concrete beam test specimens, 150 mm × 150 mm × 525 mm, shall be taken from each _____ of pavement., 330 m², 220 m², 500 m², 440 m², In Item 311, Transverse Expansion Joint, the finished joint shall not deviate more than ____ from a straight line., 3 mm, 6 mm, 4 mm, 5 mm, In Item 311, Transverse Contraction Joint/Weakened Joint, the depth of the weakened plane joint should at all times not be less than ____., 40 mm, 60 mm, 50 mm, 30 mm, In Item 311, Transverse Contraction Joint/Weakened Joint, the width should not be more than ____., 6 mm, 5 mm, 7 mm, 4 mm, In Item 311, sawing of contraction joint shall commence as soon as the concrete has hardened sufficiently to permit sawing without excessive ravelling, usually ____., 12 to 36 hours, 8 to 20 hours, 6 to 18 hours, 4 to 24 hours, In Item 311, Transverse Construction Joint shall be constructed when there is an interruption of more than ____ in the concreting operations., 20 minutes, 30 minutes, 50 minutes, 40 minutes, In Item 311, floating of concrete using the hand method, the hand-operated longitudinal float shall be not less than _____ cm in length and ____ cm in width, properly stiffened to prevent flexibility and warping., 345 cm × 35 cm, 385 cm × 25 cm, 400 cm × 20 cm, 365 cm × 15 cm, In Item 311 final finishing of surface, the brooming operation should be so executed that the corrugations produced in the surface shall be uniform in appearance and not more than _____ in depth., 1.5 mm, 2.0 mm, 3.0 mm, 4.5 mm, In Item 311 final finishing of surface, the surface of pavement shall have a coefficient of friction of ____ or more., 0.45, 0.25, 0.35, 0.55, Item 311 surface test, where the departure from correct cross-section exceeds ____, the pavement shall be removed and replaced., 14 mm, 8 mm, 12 mm, 10 mm, In Item 311, curing compound shall be applied under pressure at the rate of ____ to not more than 14 m² by mechanical sprayers., 5 L, 4 L, 7 L, 6 L, In Item 311, forms for concrete shall remain in place undisturbed for not less than ____ hours after concrete pouring., 30 hours, 20 hours, 18 hours, 24 hours, In Item 311 acceptance of concrete, strength level of the concrete will be considered satisfactory if the averages of all sets of ____ consecutive strength test results equal or exceed the specified strength., 5, 2, 3, 4, In Item 311, the road will not be opened to traffic until test specimens molded and cured have attained the minimum strength requirements. If such tests are not conducted prior to the specified age, the pavement shall not be opened to traffic until ___ days after the concrete was placed., 14 days, 16 days, 12 days, 10 days, In Item 311, when the measurement of any core is less than the specified thickness by more than 25 mm, the actual thickness of the pavement in this area will be determined by taking additional cores at no less than _____ intervals parallel to the center line in each direction from the affected location until a core is found in each direction which is not deficient in thickness by more than 25 mm., 20 m, 15 m, 5 m, 10 m, In Item 311, a lot shall be considered as ____ linear meters of pavement when a single traffic lane is poured., 1,500 m, 2,000 m, 500 m, 1,000 m

Stile di visualizzazione

Mostra tutto

Impostazioni delle attività

Classifica

AI Enhanced: Questa attività contiene contenuti generati dall'IA. Ulteriori informazioni.

Cambia modello

Ripristinare il titolo salvato automaticamente: ?