Flood Relief Channel - This involves building a new river channel to divert flood water away from towns and cities, Storage areas - Large hole/crater built near a river so if the rivers floods, the water goes in there, Afforestation - Trees are planted to increase interception of rainfall and to slow down the flow of water to the river, Dams - Built to hold back extra water and then released through the dam in a controlled way to prevent flooding, Floodplain zoning - Any new building developments are planned to be built away from floodplains where possible, Flood Walls - Big concrete walls built along a river’s course, Channelisation - River channel is widened or deepened so that it can carry more water. Might also be straightened so water gets to the sea more quickly, Washlands - These are areas which are left to flood so that flooding is avoided in other places such as towns, Warning systems - Sirens which give people an early warning of possible flooding, Embankments - Raised banks built along the river to hold back flood waters,
0%
River Management
共有
共有
共有
Csaunders3
さんの投稿です
Secondary
Geography
Rivers
River landscapes
コンテンツの編集
印刷
埋め込み
もっと見る
割り当て
リーダーボード
もっと表示する
表示を少なくする
このリーダーボードは現在非公開です。公開するには
共有
をクリックしてください。
このリーダーボードは、リソースの所有者によって無効にされています。
このリーダーボードは、あなたのオプションがリソースオーナーと異なるため、無効になっています。
オプションを元に戻す
マッチアップ
は自由形式のテンプレートです。リーダーボード用のスコアは生成されません。
ログインが必要です
表示スタイル
フォント
サブスクリプションが必要です
オプション
テンプレートを切り替える
すべてを表示
アクティビティを再生すると、より多くのフォーマットが表示されます。
オープン結果
リンクをコピー
QRコード
削除
自動保存:
を復元しますか?