The plans compare Port Harbour in 2000 with its current layout., Overall, the harbour has become more developed and tourist-oriented., Several new facilities have been added, while some older features have been replaced., The most notable change is the construction of a hotel on the eastern side., In 2000, a disused castle occupied the eastern peninsula., Today, this structure has been replaced by a hotel., A private beach for hotel guests has also been created nearby., Another major change involves the central waterfront area., The former fishing boats section has been converted into cafés and shops., The dock has been expanded and can now accommodate more boats., Additional passenger ferries are also shown in the updated plan., By contrast, several facilities have remained unchanged., These include the public beach, marina, lifeboat station and road network., The showers and toilets are still located on the western side., The two car parks also remain in their original positions., Overall, the harbour now offers more services for visitors and tourists.
0%
C19T2W1
共有
共有
Kienlee273
さんの投稿です
コンテンツの編集
印刷
埋め込み
もっと見る
割り当て
リーダーボード
もっと表示する
表示を少なくする
このリーダーボードは現在非公開です。公開するには
共有
をクリックしてください。
このリーダーボードは、リソースの所有者によって無効にされています。
このリーダーボードは、あなたのオプションがリソースオーナーと異なるため、無効になっています。
オプションを元に戻す
文字を揃える
は自由形式のテンプレートです。リーダーボード用のスコアは生成されません。
ログインが必要です
表示スタイル
フォント
サブスクリプションが必要です
オプション
テンプレートを切り替える
すべてを表示
オープン結果
リンクをコピー
QRコード
削除
自動保存:
を復元しますか?