The delay was caused by a problem with the supplier., We are behind schedule because the documents arrived late., Because of the missing information, we couldn't finish the review., The client changed the requirements, so we need more time., Engineering hasn't approved the drawings yet. As a result, we can't send them to the client., Due to the holiday, the delivery will be two days late., This problem has an impact on the delivery date., The main reason for the delay is the missing technical information., This delay also affects the Logistics team., Do we know what caused the problem?, The supplier sent the wrong specifications; therefore, we had to restart the technical review., The delay was mainly caused by a lack of communication between Engineering and Sales., As a result of the late approval, the whole project schedule has been affected., One of the consequences of this delay is that Logistics will need to reorganize the transport., To avoid the same problem in the future, I suggest we review our approval process.
0%
Explaining Cause and Consequence (L)
共有
共有
Acessosembassy
さんの投稿です
コンテンツの編集
印刷
埋め込み
もっと見る
割り当て
リーダーボード
もっと表示する
表示を少なくする
このリーダーボードは現在非公開です。公開するには
共有
をクリックしてください。
このリーダーボードは、リソースの所有者によって無効にされています。
このリーダーボードは、あなたのオプションがリソースオーナーと異なるため、無効になっています。
オプションを元に戻す
文字を揃える
は自由形式のテンプレートです。リーダーボード用のスコアは生成されません。
現在、リーダーボード機能の改善に取り組んでいます。フィードバックをお寄せください。
フィードバックを提供する
ログインが必要です
表示スタイル
フォント
サブスクリプションが必要です
オプション
現在、アクティビティ設定の改善に取り組んでいます。ご意見をお寄せいただければ幸いです。
フィードバックを提供する
テンプレートを切り替える
すべてを表示
オープン結果
リンクをコピー
QRコード
削除
自動保存:
を復元しますか?