Cavity lintel, 150mm bearing, Concrete lintel, 100mm bearing, DPC, Stops rising damp, minimum 150mm above ground level, Partial fill insulation, Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation, Blown in at a later date, EWI insulation, Fitted on external leaf, Vertical damp course, Prevents ingress of damp up openings, Cavity tray, Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes, Allows moisture to leave the cavity, DPM, Stops damp rising through the floor, Wall ties, 450mm x 900mm spacings, Expansion wall ties, Allows movement on long lengths of masonry, Restraint straps, Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate, Spreads the weight of the roof down the masonry, Gable end, Proprietary wall starters, Where new masonry is attached to old masonry., Air bricks, Allows air flow to enter the build, Architects drawings and specification, Where we can find information on components, Window sill, Direct water to outer leaf under a window., Full-fill insulation, Allows air flow through the fibres., Cavity closer, Seals cavity at an opening.
0%
Walling components
共有
共有
Stephenbull
さんの投稿です
Workplace
Construction
コンテンツの編集
セーブ
いいね!
印刷
埋め込み
もっと見る
割り当て
リーダーボード
もっと表示する
表示を少なくする
このリーダーボードは現在非公開です。公開するには
共有
をクリックしてください。
このリーダーボードは、リソースの所有者によって無効にされています。
このリーダーボードは、あなたのオプションがリソースオーナーと異なるため、無効になっています。
オプションを元に戻す
バルーンポップ
は自由形式のテンプレートです。リーダーボード用のスコアは生成されません。
現在、リーダーボード機能の改善に取り組んでいます。フィードバックをお寄せください。
フィードバックを提供する
ログインが必要です
表示スタイル
フォント
サブスクリプションが必要です
オプション
現在、アクティビティ設定の改善に取り組んでいます。ご意見をお寄せいただければ幸いです。
フィードバックを提供する
テンプレートを切り替える
すべてを表示
オープン結果
リンクをコピー
QRコード
削除
自動保存:
を復元しますか?