In Lean Manufacturing, what does Muda mean?, Overburdening workers or equipment, Waste that consumes resources without adding value, Unevenness in production or workload, A method for preventing human error, A factory produces 100 units on Monday, 250 on Tuesday and 80 on Wednesday because demand and production schedules fluctuate considerably. Which Lean concept best describes this unevenness?, Kaizen, Muri, Muda, Mura, Workers are regularly required to lift loads beyond safe limits and operate machinery at excessive capacity to meet deadlines. Which Lean concept is most directly involved?, Mura, Muri, Poka-Yoke, Muda, What is the primary purpose of Poka-Yoke in a production process?, Increase production batches to reduce changeovers, Eliminate the need for quality inspections in every situation, Ensure that workers perform tasks faster, Prevent mistakes or make errors immediately detectable, Which of the following are examples of Muda (waste) in Lean Manufacturing? Select every correct answer., Moving materials repeatedly between distant storage areas, A standardised inspection that prevents defective products from reaching customers, Keeping excessive inventory that is not needed for current demand, Producing items before customers need them, Which sequence correctly lists the five stages of 5S in their commonly used English form?, Sort, Shine, Set in order, Sustain, Standardise, Set in order, Sort, Standardise, Shine, Sustain, Sort, Set in order, Shine, Standardise, Sustain, Sort, Standardise, Set in order, Sustain, Shine, Kaizen is based on continuous improvement through ongoing changes, often involving employees at different levels of an organisation., True, False, A supermarket replenishes products in small quantities in response to actual consumption instead of storing large quantities far in advance. Which Lean principle is most directly illustrated?, Just-in-Time (JIT), Poka-Yoke, Muri, 5S, A Kanban system is primarily a push system in which production is scheduled independently of actual downstream consumption., True, False, A project team spends two hours each week entering the same information into three separate spreadsheets. The information is not improved by this repetition. Which type of waste is most directly illustrated?, Overproduction, Transportation, Waiting, Unnecessary processing
0%
LEAN TERMS
공유
공유
만든이
Stefanierankin6
Universiteit (WO)
콘텐츠 편집
저장
좋아요
인쇄
퍼가기
더보기
로그인이 필요합니다
비주얼 스타일
모두 표시
글꼴
활동 설정
순위표
할당
구독 필요
활동 설정
순위표
이 순위표는 현재 비공개입니다.
공유
를 클릭하여 공개할 수 있습니다.
자료 소유자가 이 순위표를 비활성화했습니다.
옵션이 자료 소유자와 다르기 때문에 이 순위표가 비활성화됩니다.
옵션 되돌리기
더 보기
접기
퀴즈
(은)는 개방형 템플릿입니다. 순위표에 올라가는 점수를 산출하지 않습니다.
할당
아직 학생들과 공유한 액티비티가 없습니다.
결과 수집을 시작하려면 활동 페이지로 이동하여
할당 설정을
선택합니다.
설정을 확인하고 결과 링크를 학생들과 공유합니다.
과제 설정
템플릿 전환하기
모두 표시
결과 열기
링크 복사
QR 코드
삭제
자동 저장된
게임을 복구할까요?