Test 1 , Continuity of Protective Conductors, Test 2, Continuity of Ring Final Circuit , Test 3, Insulation Resistance , Test 4 , Polarity , Test 5 , Earth Electrode Resistance , Test 6 , Protection by automatic disconnection, Test 7 , Earth Fault Loop Impedance , Test 8 , Prospective Fault Current , Test 9 , Phase Rotation , Test 10 , Functional Test, Including RCDs and Switchgear , Test 11, Verification of Voltage Drop .