1) What certificate would be issued for new installation work? a) Minor Electrical Works Installation Certificate b) Electrical Installation Certificate c) Schedule of inspections d) Electrical Installation Condition Report 2) Which of the following is not required to sign an Electrical Installation Certificate? a) Designer b) Inspector c) Client d) Installer 3) On an EICR an observation Code 1 means a) Improvement recommended b) Potentially dangerous c) Danger present d) Not dangerous 4) On an EICR an observation Code 2 means a) Potentially dangerous b) Mostly dangerous c) Possibly dangerous d) Maybe dangerous 5) How many parts make up an Electrical Installation Certificate? a) 1 b) 2 c) 4 d) 3 6) According to Guidance Note 3 what is the maximum allowed time between initial verification & first condition report for a domestic premises? a) 100 years b) 5 years c) 15 years d) 10 years 7) An observation Code 3 would be attributed where a) An absence of notice indicating the installation has 2 colours to BS 7671 b) Electrical equipment having inadequate degrees of ingress protection c) Fire risk from lamps exceeding maximum rated wattage for luminaires d) Evidence of excessive heat from electrical equipment 8) An observation Code 1 would be attributed where a) An accessory is badly damaged b) Absence of CPC's in circuits having only Class II luminaires & switches c) There is an absence of identification labels d) a socket outlet is mounted in a position which may damage a plug/flex 9) A lighting circuit has been extended and a spur added to a ring final circuit, what certification would be issued? a) EICR b) Two MEIWC's c) EIC d) MEIWC 10) On completion of initial verification, who would receive the EIC? a) The designer b) The installer c) The inspector d) The client 11) What level of protection would be offered to the top horizontal surface of an enclosure? a) IPX4 b) IP4X c) IPX2 d) IP2X 12) Which of the following would not be a reason for requesting an EICR? a) Change of ownership b) Change of building use c) Extension to an existing circuit d) Previous certificate has expired 13) How many signatories are required on a MEIWC? a) 1 b) 2 c) 3 d) 4 14) Which earthing system is not recognised by BS 7671 for public distribution systems? a) TT b) TN-C c) TN-S d) TN-C-S 15) What level of protection should be afforded to the front surface of an enclosure? a) IPX4 b) IP4X c) IP2X d) IPX2 16) What is the categorisation of fuse that has replaced BS 1361? a) BS 1362 b) BS 3036 c) BS 88-2 d) BS 3871 17) RCD's & RCBO's with an IΔn of ≤ 30mA are installed as a means of offering a) Additional protection b) Extra protection c) Reactive protection d) Supplementary protection 18) A bare & unsleeved CPC of a twin & CPC cable would receive which Code? a) Code 1 b) Code 3 c) Code 2 d) FI 19) A bonding clamp to BS 951 with a missing label stating, "Safety Electrical Connection Do Not Remove" would receive a a) FI b) Code 3 c) Code 1 d) Code 2 20) A "borrowed neutral" e.g. where a single final circuit neutral is shared by two final circuits would be attributed a) Code 2 b) Code 3 c) FI d) Code 1
0%
Certification
공유
공유
공유
만든이
Wlcconstruction
콘텐츠 편집
인쇄
퍼가기
더보기
할당
순위표
더 보기
접기
이 순위표는 현재 비공개입니다.
공유
를 클릭하여 공개할 수 있습니다.
자료 소유자가 이 순위표를 비활성화했습니다.
옵션이 자료 소유자와 다르기 때문에 이 순위표가 비활성화됩니다.
옵션 되돌리기
게임쇼 퀴즈
(은)는 개방형 템플릿입니다. 순위표에 올라가는 점수를 산출하지 않습니다.
로그인이 필요합니다
비주얼 스타일
글꼴
구독 필요
옵션
템플릿 전환하기
모두 표시
액티비티를 플레이할 때 더 많은 포맷이 나타납니다.
결과 열기
링크 복사
QR 코드
삭제
자동 저장된
게임을 복구할까요?