1) 1. What is the cyde of Al projects primary objective? a) To create complex Al models quickly. b) To simplify the process of converting problems from the actual world into code c) To provide a structured framework for managing Al projects. d) To reduce the cost of developing Al-based remedies. 2) What is the initial stage of an Al project's lifecycle? a) Outlining the technology specifications for the Al model. b) Converting the real-world problem into an Al job with precise definitions c) Compiling and preparing the data required for the Al model's training. d) Selecting the Al algorithm that works best for the given job. 3) Which of the following metrics may be produced from a confusion matrix? a) Execution time and Memory usage b) Recall Precision, Accuracy, and F1 Score c) Learning rate and Batch size d) Data acquisition and Data cleaning 4) What is the primary purpose of the confusion matrix while evaluating an Al model? a) To measure the execution time of the model b) To identify the best algorithm for the model c) To measure the performance of an Al model using the test data d) To optimize the hyper parameters of the model 5) Problem scoping means selecting a problem and finding a solution for it using Al technology a) true b) false 6) Evaluation is a process that critically examines a program. a) true b) false 7) The deployment phase of the Al project cycle involves integrating the model into the production environment and does not require any further monitoring a) true b) False
0%
Ai project cycle class 9
공유
공유
공유
만든이
29111980winter
Class 9
Computer
콘텐츠 편집
인쇄
퍼가기
더보기
할당
순위표
더 보기
접기
이 순위표는 현재 비공개입니다.
공유
를 클릭하여 공개할 수 있습니다.
자료 소유자가 이 순위표를 비활성화했습니다.
옵션이 자료 소유자와 다르기 때문에 이 순위표가 비활성화됩니다.
옵션 되돌리기
퀴즈
(은)는 개방형 템플릿입니다. 순위표에 올라가는 점수를 산출하지 않습니다.
로그인이 필요합니다
비주얼 스타일
글꼴
구독 필요
옵션
템플릿 전환하기
모두 표시
액티비티를 플레이할 때 더 많은 포맷이 나타납니다.
결과 열기
링크 복사
QR 코드
삭제
자동 저장된
게임을 복구할까요?