sea level, it is the elevation than a field have reec with the sea level, field, it is the main part where we are going to contruct the road, horizontal alignment, it is the route that the road should to follow without change the elevation or the sea level in the plane, vertical alignment, that is the curves than a route should to follow for a while, and it change the elevation of the field where we are going to construct the road, pile, it is a fundation than we use in a bridge, a house or build, this element ir bigger than a piling, foundations, it is one of the most important parts of a construction of a build or road, it is going down the earth, BIM, building information modeling, concrete, it is the combination of whather, sand, grave and cement, and we have to wait for a while, filter, it is something than take wather to take care of bae and sub base, ditch, it is a hole, volume, it is the unit of meditionin cubic meters, gang or squad, 4 black mans, excavator, it is a machine than we use to retirate earth from the field
0%
jm
공유
공유
공유
만든이
Juanjaime7878
콘텐츠 편집
인쇄
퍼가기
더보기
할당
순위표
더 보기
접기
이 순위표는 현재 비공개입니다.
공유
를 클릭하여 공개할 수 있습니다.
자료 소유자가 이 순위표를 비활성화했습니다.
옵션이 자료 소유자와 다르기 때문에 이 순위표가 비활성화됩니다.
옵션 되돌리기
매치업
(은)는 개방형 템플릿입니다. 순위표에 올라가는 점수를 산출하지 않습니다.
로그인이 필요합니다
비주얼 스타일
글꼴
구독 필요
옵션
템플릿 전환하기
모두 표시
액티비티를 플레이할 때 더 많은 포맷이 나타납니다.
결과 열기
링크 복사
QR 코드
삭제
자동 저장된
게임을 복구할까요?