Cavity lintel - 150mm bearing , Concrete lintel - 100mm bearing, DPC - Stops rising damp, minimum 150mm above ground level, Partial fill insulation - Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation - Blown in at a later date, EWI insulation - Fitted on external leaf, Vertical damp course - Prevents ingress of damp up openings, Cavity tray - Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes - Allows moisture to leave the cavity, DPM - Stops damp rising through the floor, Wall ties - 450mm x 900mm spacings, Expansion wall ties - Allows movement on long lengths of masonry, Restraint straps - Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate - Spreads the weight of the roof down the masonry, Gable end, Proprietary wall starters - Where new masonry is attached to old masonry., Air bricks - Allows air flow to enter the build, Architects drawings and specification - Where we can find information on components, Window sill - Direct water to outer leaf under a window., Full-fill insulation - Allows air flow through the fibres. , Cavity closer - Seals cavity at an opening. ,
0%
Walling components
Kopīgot
Kopīgot
Kopīgot
autors:
Stephenbull
Workplace
Construction
Rediģēt saturu
Drukāt
Iegult
Vairāk
Uzdevumus
Līderu saraksts
Rādīt vairāk
Rādīt mazāk
Šī līderu grupa pašlaik ir privāta. Noklikšķiniet uz
Kopīgot
, lai to publiskotu.
Mācību līdzekļa īpašnieks ir atspējojis šo līderu grupu.
Šī līderu grupa ir atspējota, jo jūsu izmantotās iespējas atšķiras no mācību līdzekļa īpašnieka iespējām.
Atjaunot sākotnējās iespējas
Balonu pārduršana
ir atvērta veidne. Tā neģenerē rezultātus līderu grupai.
Nepieciešams pieteikties
Vizuālais stils
Fonts
Nepieciešams abonements
Iespējas
Pārslēgt veidni
Rādīt visus
Atskaņojot aktivitāti, tiks parādīti vairāki formāti.
Atvērtie rezultāti
Kopēt saiti
QR kods
Dzēst
Atjaunot automātiski saglabāto:
?