keep sth on track, to make sure something continues according to the plan and is not delayed, monitor, to regularly check or observe something to see how it is progressing, stay on schedule, to continue according to the planned timetable, timeline, a plan showing when different activities or stages of a project should happen, deliverables, the specific results, products, or pieces of work that a project is expected to produce, visualize, to represent information in a way that makes it easier to see and understand, baseline, the original project plan used as a reference for comparing actual progress, milestone, an important stage or event in a project that shows significant progress, check-in, a short meeting or conversation to discuss progress, problems, or updates, indicator, a measurement or sign that shows how well something is progressing or performing, scope, the boundaries of a project, including what the project does and does not include, roadblock, a problem or obstacle that prevents progress, address (verb), to deal with, investigate, or take action to solve a problem
0%
Monitoring Project Progress
Kongsikan
Kongsikan
oleh
Szczepanikbasia
Edit Kandungan
Simpan
Sukai
Cetakan
Benamkan
Lebih lagi
Tugasan
Papan mata
Paparkan banyak
Paparkan sedikit
Papan mata ini berciri peribadi pada masa ini. Klik
Kongsikan
untuk menjadikannya umum.
Papan mata ini telah dilumpuhkan oleh pemilik sumber.
Papan mata ini dinyahdayakan kerana pilihan anda berbeza daripada pemilik sumber.
Pilihan untuk Kembali
Padankan
ialah templat terbuka. Ia tidak menjana skor untuk papan mata.
Log masuk diperlukan
Gaya visual
Fon
Langganan diperlukan
Pilihan
Tukar templat
Paparkan semua
Buka keputusan
Salin pautan
Kod QR
Padam
Pulihkan autosimpan:
?