Direct Changeover, Instant switch from old to new, Lowest cost but highest risk, Some downtime while systems switch, Testing must be rigorous, Parallel Running, Old and new system run together, Data entered into both, Safest but most expensive and time consuming method, Pilot Running, Used/tested in one area first e.g. one hotel, Rolled out after successful testing, Only one area affected, Small-group training first which can be used across all areas inhouse later, Phased Implementation, Introduced in stages, Gradual staff training and adaptation, Only failed phase needs testing and fixing, Compatibility concerns.
0%
BTEC: Implementation methods
Delen
Delen
Delen
door
Mrssherrington
Y12
Computing
Inhoud Bewerken
Afdrukken
Embedden
Meer
Toewijzingen
Scorebord
Meer weergeven
Minder weergeven
Dit scoreboard is momenteel privé. Klik op
Delen
om het publiek te maken.
Dit scoreboard is uitgeschakeld door de eigenaar.
Dit scoreboard is uitgeschakeld omdat uw opties anders zijn dan die van de eigenaar.
Opties Herstellen
Sorteren
is een open template. Het genereert geen scores voor een scoreboard.
Inloggen vereist
Visuele stijl
Lettertypen
Abonnement vereist
Opties
AI Enhanced: Deze activiteit bevat content die door AI wordt gegenereerd.
Meer informatie.
Template wisselen
Alles weergeven
Er zullen meer templates verschijnen terwijl je de activiteit gebruikt.
)
Open resultaten
Kopieer link
QR-code
Verwijderen
Automatisch opgeslagen activiteit "
" herstellen?