sea level, it is the elevation than a field have reec with the sea level, field, it is the main part where we are going to contruct the road, horizontal alignment, it is the route that the road should to follow without change the elevation or the sea level in the plane, vertical alignment, that is the curves than a route should to follow for a while, and it change the elevation of the field where we are going to construct the road, pile, it is a fundation than we use in a bridge, a house or build, this element ir bigger than a piling, foundations, it is one of the most important parts of a construction of a build or road, it is going down the earth, BIM, building information modeling, concrete, it is the combination of whather, sand, grave and cement, and we have to wait for a while, filter, it is something than take wather to take care of bae and sub base, ditch, it is a hole, volume, it is the unit of meditionin cubic meters, gang or squad, 4 black mans, excavator, it is a machine than we use to retirate earth from the field
0%
jm
Delen
Delen
Delen
door
Juanjaime7878
Inhoud Bewerken
Afdrukken
Embedden
Meer
Toewijzingen
Scorebord
Meer weergeven
Minder weergeven
Dit scoreboard is momenteel privé. Klik op
Delen
om het publiek te maken.
Dit scoreboard is uitgeschakeld door de eigenaar.
Dit scoreboard is uitgeschakeld omdat uw opties anders zijn dan die van de eigenaar.
Opties Herstellen
Verbinden
is een open template. Het genereert geen scores voor een scoreboard.
Inloggen vereist
Visuele stijl
Lettertypen
Abonnement vereist
Opties
Template wisselen
Alles weergeven
Er zullen meer templates verschijnen terwijl je de activiteit gebruikt.
Open resultaten
Kopieer link
QR-code
Verwijderen
Automatisch opgeslagen activiteit "
" herstellen?