When should a test procedure should be planned?, Before installation, After installation, After customer handover, Before customer handover, What should you do if a test does not work?, Repair and re-test, Repair and repeat all tests, Carry on as if nothing went wrong, Pick a different test, Which of the following is not a software testing tool?, Bench-marking tool, BIOS, Remote desktop software, Volt meter, If a computer will not turn on what is the first thing to check?, There is a working fuse in the plug, The power supply is connected to the motherboard, The power is plugged in to a live socket, The power switch is connected to the mother board, When should initial benchmark testing be performed?, When the system fails, During normal operation, after the system has been tested, Every week, A valid test is one which?, Happens once, Produces a result, Does not work, Is repeatable, Which field is not needed in a test document?, Date of birth, Engineers name, Customers Name, Test date, If a version of testing software is available at no cost it could be?, Closed source, Propitiatory, Commercial, Freeware.
0%
Hardware testing
Del
Del
Del
etter
Neil5
KS4
Computing
Testing and Debugging
Rediger innhold
Skriv ut
Innebygd
Mer
Tildelinger
Ledertavle
Vis mer
Vis mindre
Denne ledertavlen er for øyeblikket privat. Klikk
Share
for å gjøre den offentlig.
Denne ledertavlen er deaktivert av ressurseieren.
Denne ledertavlen er deaktivert fordi alternativene er forskjellige fra ressurseieren.
Alternativer for tilbakestilling
Spørrelek
er en åpen mal. Det genererer ikke poengsummer for en ledertavle.
Pålogging kreves
Visuell stil
Skrifter
Krever abonnement
Alternativer
Bytt mal
Vis alle
Flere formater vises når du spiller av aktiviteten.
)
Åpne resultater
Kopier kobling
QR-kode
Slette
Gjenopprett automatisk lagring:
?