What is the 1st step in the 5S process?, Standardized, Sort, Sweep, Sustain, Thick dark line use to show outline of object, visible edges, and surfaces., Vissible line, Hidden line, Construction line, Dimension line, Very light and thin line use to construct layout work., Construction lonr, Dimension line, Visible line, Hidden line, Short dash lines use to show nonvisible surfaces. Usually shows as medium thickness., Dimension line, Hidden line, Leader line, Section line, Medium line with arrowhead to show notes or label for size or special information about a feature., Construction line, Leader line, Section line, Visiblle line
0%
Technical Drafting 7
Del
Del
etter
Johnny78
Rediger innhold
Skriv ut
Innebygd
Mer
Tildelinger
Ledertavle
Vis mer
Vis mindre
Denne ledertavlen er for øyeblikket privat. Klikk
Share
for å gjøre den offentlig.
Denne ledertavlen er deaktivert av ressurseieren.
Denne ledertavlen er deaktivert fordi alternativene er forskjellige fra ressurseieren.
Alternativer for tilbakestilling
Spørrelek
er en åpen mal. Det genererer ikke poengsummer for en ledertavle.
Pålogging kreves
Visuell stil
Skrifter
Krever abonnement
Alternativer
Bytt mal
Vis alle
Åpne resultater
Kopier kobling
QR-kode
Slette
Gjenopprett automatisk lagring:
?