Cavity lintel - 150mm bearing , Concrete lintel - 100mm bearing, DPC - Stops rising damp, minimum 150mm above ground level, Partial fill insulation - Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation - Blown in at a later date, EWI insulation - Fitted on external leaf, Vertical damp course - Prevents ingress of damp up openings, Cavity tray - Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes - Allows moisture to leave the cavity, DPM - Stops damp rising through the floor, Wall ties - 450mm x 900mm spacings, Expansion wall ties - Allows movement on long lengths of masonry, Restraint straps - Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate - Spreads the weight of the roof down the masonry, Gable end, Proprietary wall starters - Where new masonry is attached to old masonry., Air bricks - Allows air flow to enter the build, Architects drawings and specification - Where we can find information on components, Window sill - Direct water to outer leaf under a window., Full-fill insulation - Allows air flow through the fibres. , Cavity closer - Seals cavity at an opening. ,
0%
Walling components
Compartilhar
Compartilhar
Compartilhar
de
Stephenbull
Workplace
Construction
Editar conteúdo
Imprimir
Incorporar
Mais
Atribuições
Ranking
Mostrar mais
Mostrar menos
Atualmente, este ranking é particular. Clique em
Compartilhar
para torná-lo público.
Este ranking foi desativado pelo proprietário do recurso.
Este ranking está desativado, pois suas opções e as do proprietário do recurso são diferentes.
Reverter opções
Estoura balões
é um modelo aberto. Ele não gera pontuações para um ranking.
Login necessário
Estilo visual
Fontes
Assinatura necessária
Opções
Alterar modelo
Mostrar todos
Mais formatos serão exibidos à medida que você executar a atividade.
Resultados em aberto
Copiar link
Código QR
Excluir
Restaurar arquivo salvo automaticamente:
?