1) When should a test procedure should be planned? a) Before installation b) After installation c) After customer handover d) Before customer handover 2) What should you do if a test does not work? a) Repair and re-test b) Repair and repeat all tests c) Carry on as if nothing went wrong d) Pick a different test 3) Which of the following is not a software testing tool? a) Bench-marking tool b) BIOS c) Remote desktop software d) Volt meter 4) If a computer will not turn on what is the first thing to check? a) There is a working fuse in the plug b) The power supply is connected to the motherboard c) The power is plugged in to a live socket d) The power switch is connected to the mother board 5) When should initial benchmark testing be performed? a) When the system fails b) During normal operation c) after the system has been tested d) Every week 6) A valid test is one which? a) Happens once b) Produces a result c) Does not work d) Is repeatable 7) Which field is not needed in a test document? a) Date of birth b) Engineers name c) Customers Name d) Test date 8) If a version of testing software is available at no cost it could be? a) Closed source b) Propitiatory c) Commercial d) Freeware

Leaderboard

Theme

Options

Switch template

Continue editing: ?