If we had checked the model earlier, we ______ clashes on site., If engineers use BIM tools, they ______ coordination errors., If you finish the Revit model today, we ______ it to the client tomorrow., If I were better at Autodesk Revit, I ______ more complex structures., If a building is poorly designed, construction costs ______., If they had used BIM properly, the project ______ faster., If you change a parameter in Autodesk Revit, the model ______ automatically., If we didn’t use Autodesk Revit, coordination ______ much harder., If the engineer had updated the drawings, the team ______ that mistake., If the team detects clashes early, they ______ time during construction., If you don’t check clashes in Autodesk Revit, problems ______ on site., If the project had more budget, we ______ more advanced tools., If you improve the model, the project ______ more smoothly., If I had learned Autodesk Revit sooner, I ______ that job., If you worked as a BIM manager, you ______ all disciplines., If we follow the BIM workflow, we ______ many mistakes.
0%
REVIT
Partajează
Partajează
Partajează
de
Spotschool
Editează conținutul
Imprimare
Încorporează
Mai multe
Misiuni
Clasament
Arată mai mult
Arată mai puțin
Acest clasament este în prezent privat. Fă clic pe
Distribuie
pentru a-l face public.
Acest clasament a fost dezactivat de proprietarul resursei.
Acest clasament este dezactivat, deoarece opțiunile tale sunt diferite de ale proprietarului resursei.
Opțiuni de revenire
Carduri flash
este un șablon deschis. Nu generează scoruri pentru un clasament.
Este necesară conectarea
Stilul vizual
Fonturi
Este necesar un abonament
Opţiuni
Comutare șablon
Arată tot
Mai multe formate vor apărea pe măsură ce folosești activitatea.
)
Rezultate deschise
Copiați linkul
Cod QR
Şterge
Restaurare activitate salvată automat:
?