When selecting materials, what documents do we refer to? , Drawings and specifications, Method Statement, Risk Assessment, Programme of works, Why do we ensure correct ratio's when mixing? , It's British law. , The customer has asked for it, Ensure consistency throughout the build, We need to ensure our mix is weak, When cutting, what rule do we follow?, Cut - measure - mark, Mark - measure - cut, Mark - cut - measure, Measure - mark - cut, Where should materials be placed when mixing? , At the site entrance, Next to the mixing area, On the scaffold, Near the site boundary, Identify the tool used to find angles when cutting. , , , , , Identify the items of PPE that would give you the best protection when cutting with a masonry saw., Safety boots and hard hat, High Vis vest and visor, Safety goggles and ear defenders, Overalls and sunscreen, What should we do with our back when lifting materials?, Keep it bent, Keep it 90 degrees, Keep is 45 degrees, Keep it straight, Identify the main reason we should use lifting aids as much as possible. , Saves money, Avoiding manual handling, Insurance purposes, We have the training, Why should materials be stored just away from the trench edge?, To avoid trench collapse, So we have to walk to get them, To encourage stretching, To make it harder for us, When building a standard cavity wall, where would the blocks be loaded out to? , External side, Internal side, In the cavity, Below DPC, Identify the best reason why our working platforms are kept tidy, To make cleaning up easier, To avoid damage to brick face, To keep the customer happy, To avoid slips and trips, Where can spilled mortar end up when it splatters?, On the brickface, In the skip, On the customers head, On a public highway, Find the reason we cover all materials when not in use., To prevent theft, To prevent insect attack, To protect against inclement weather, To aid in building, When is the best time to install stone decorative features?, Before works commences , During the building process, After the building process, One week after the building process, Identify how we protect newly laid masonry from frost., Hessian, Polythene, Tarpaulin , Carpet, Identify how we protect newly laid masonry from rain, Hessian, Polythene, Carpet, Cardboard.
0%
Preparing materials
Partajează
Partajează
Partajează
de
Stephenbull
Workplace
Construction
Editează conținutul
Imprimare
Încorporează
Mai multe
Misiuni
Clasament
Arată mai mult
Arată mai puțin
Acest clasament este în prezent privat. Fă clic pe
Distribuie
pentru a-l face public.
Acest clasament a fost dezactivat de proprietarul resursei.
Acest clasament este dezactivat, deoarece opțiunile tale sunt diferite de ale proprietarului resursei.
Opțiuni de revenire
Deschide caseta
este un șablon deschis. Nu generează scoruri pentru un clasament.
Este necesară conectarea
Stilul vizual
Fonturi
Este necesar un abonament
Opţiuni
Comutare șablon
Arată tot
Mai multe formate vor apărea pe măsură ce folosești activitatea.
)
Rezultate deschise
Copiați linkul
Cod QR
Şterge
Restaurare activitate salvată automat:
?