1A stage, Vehicle trial with OTOP condition, Readiness confirmation, Preparation confirmation before Packing/Trial/SOP, 1K stage, Unit trial (Engine, etc.) with OTOP condition, SOP, Start of Mass Production(New Model), RCI, Document to inform change routing code, NEIC, Document to inform change implementation timing, ECR, Document to request change design content, Doren (SCI), Document to inform Production Suffix Spec. change, Production Suffix, Model that was fixed spec. by sale's selection