The delay was caused by a problem with the supplier., We are behind schedule because the documents arrived late., Because of the missing information, we couldn't finish the review., The client changed the requirements, so we need more time., Engineering hasn't approved the drawings yet. As a result, we can't send them to the client., Due to the holiday, the delivery will be two days late., This problem has an impact on the delivery date., The main reason for the delay is the missing technical information., This delay also affects the Logistics team., Do we know what caused the problem?, The supplier sent the wrong specifications; therefore, we had to restart the technical review., The delay was mainly caused by a lack of communication between Engineering and Sales., As a result of the late approval, the whole project schedule has been affected., One of the consequences of this delay is that Logistics will need to reorganize the transport., To avoid the same problem in the future, I suggest we review our approval process.
0%
Explaining Cause and Consequence (L)
共享
共享
由
Acessosembassy
编辑内容
打印
嵌入
更多
作业
排行榜
显示更多
显示更少
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
句子排列
是一个开放式模板。它不会为排行榜生成分数。
我们目前正在努力改进排行榜功能。请通过提供您的反馈来帮助我们。
提供反馈
需要登录
视觉风格
字体
需要订阅
选项
我们目前正在改进活动设置。请通过反馈帮助我们。
提供反馈
切换模板
显示所有
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?