"push" production - production is based on orders from last year (a forecast), "pull" production - a product is made when the customer orders it, batch production - products move through a production line in groups of parts, one piece flow - products move through a production line one part at a time, line balancing - making the work time even (about the same) for all work stations, a bottleneck - when the flow of material "gets stuck" between two work stations, causing a "back-up", a kanban - a visible instruction card or sign used in a production line, point of use storage - all materials and tools are stored at the workstation where they are used, "quality at the source" - each employee is responsible for the quality of the final product, lead time - how long it takes to make (and deliver) a product,
0%
"Push" vs. "Pull" Manufacturing
共享
共享
共享
由
Bjordan
编辑内容
打印
嵌入
更多
作业
排行榜
显示更多
显示更少
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
匹配游戏
是一个开放式模板。它不会为排行榜生成分数。
需要登录
视觉风格
字体
需要订阅
选项
切换模板
显示所有
播放活动时将显示更多格式。
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?