When setting out a building, what would be determined from a TBM?, Frontage line, Position of the building, Finished floor level, Boundary line, What is the area of a triangle?, WxD, DxH, LxB, WxH/2, A ground floor load bearing wall supports the........, Foundations, Weight above, Oversite concrete, Damp proof membrane, Non-loadbearing stud partitions re required to....., Support the floor above, Divide up the floor space, Distribute the weight of the roof, Support the staircase, Which insulation is most effective under a solid floor?, Mineral wool, Polyisocyanurate, Polystyrene balls, Cork sheeting, 1 litre of emulsion covers 13m2. How many litres is needed to cover 52m2 of wall area?, 2 litres, 3 litres, 4 litres, 5 litres, When constructing a solid ground floor what is the purpose of the blinding sand?, To provide a smooth base for the hardcore, To provide a smooth base for the DPM, To prevent moisture from rising from the ground, To waterproof the floor in case of flooding, Which of the following supports the floor boards?, Joists, Blinding sand, Wall plate, Sleeper wall, If a room is 3m wide and 6m long, how many metres of 100mm wide floorboards are required to cover the area?, 18m, 90m, 180m, 210m, 80m of floor boarding is required for a job, however the 5% wastage has not been included. What is the total amount of floor boarding required?, 85m, 84m, 76m, 75m
0%
Unit 202d
共享
共享
由
Shough
FE
Construction
编辑内容
保存
喜欢
打印
嵌入
更多
需要登录
视觉风格
字体
活动设置
排行榜
作业
需要订阅
活动设置
排行榜
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
显示更多
显示更少
随堂测验
是一个开放式模板。它不会为排行榜生成分数。
作业
您尚未与学生分享任何活动。
要开始收集结果,请转到任何活动页面,然后选择
Set assignment(设置分配
)。
确认您的设置并与学生共享生成的链接。
设置作业
切换模板
显示所有
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?