Cavity lintel, 150mm bearing, Concrete lintel, 100mm bearing, DPC, Stops rising damp, minimum 150mm above ground level, Partial fill insulation, Must build blockwork first, joints taped and batts are bonded, Retro-fit insulation, Blown in at a later date, EWI insulation, Fitted on external leaf, Vertical damp course, Prevents ingress of damp up openings, Cavity tray, Installed whenever a cavity is bridged, at an abutment or parapet wall, directs water outside., Weep holes, Allows moisture to leave the cavity, DPM, Stops damp rising through the floor, Wall ties, 450mm x 900mm spacings, Expansion wall ties, Allows movement on long lengths of masonry, Restraint straps, Ties masonry to components like roof and floor. Prevents lateral movement., Wall plate, Spreads the weight of the roof down the masonry, Gable end, Proprietary wall starters, Where new masonry is attached to old masonry., Air bricks, Allows air flow to enter the build, Architects drawings and specification, Where we can find information on components, Window sill, Direct water to outer leaf under a window., Full-fill insulation, Allows air flow through the fibres., Cavity closer, Seals cavity at an opening.
0%
Walling components
共享
共享
由
Stephenbull
Workplace
Construction
编辑内容
保存
喜欢
打印
嵌入
更多
需要登录
视觉风格
字体
活动设置
排行榜
作业
需要订阅
活动设置
排行榜
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
显示更多
显示更少
刺破气球
是一个开放式模板。它不会为排行榜生成分数。
作业
您尚未与学生分享任何活动。
要开始收集结果,请转到任何活动页面,然后选择
Set assignment(设置分配
)。
确认您的设置并与学生共享生成的链接。
设置作业
切换模板
显示所有
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?