1) Which of the following is NOT a phase in the waterfall model? a) Requirement gathering b) Design c) Risk management d) Testing 2) Which of the following is a benefit of the waterfall model? a) Adjusting scope during the life cycle can end a project b) High amounts of risk and uncertainty c) It is difficult to measure progress within stages d) Phases are processed and completed one at a time. 3) Maintenance is the final phase in waterfall model. a) True b) False 4) A stage in which individual components are integrated and ensured that they are error-free to meet customer requirements. a) Coding b) Testing c) Design d) Implementation 5) Methodology in which project management processes were step-by step. a) Incremental b) Waterfall c) Spiral d) Prototyping
0%
Waterfall Model - Quiz
共享
共享
共享
由
Breada2188
编辑内容
打印
嵌入
更多
作业
排行榜
显示更多
显示更少
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
问答游戏
是一个开放式模板。它不会为排行榜生成分数。
需要登录
视觉风格
字体
需要订阅
选项
切换模板
显示所有
播放活动时将显示更多格式。
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?