The agile development process uses an ____ methodology in which solutions evolve through collaboration between cross-____ teams. There is much ____ focus on planning and more on being able to respond to ____ needs as they arise. Rather than following a ____ set of steps for the development of the entire system, parts of the system are developed in ____ involving analysis, design, implementation and testing. The client is often given a ____ early in the sprint so they can provide feedback that can be A drawback of the agile methodology is that the emphasis on team work and face-to-face communication are ____ for long term, and large scales. The iterative or ____ development methodology follow a set of steps in a specific ____ but also allows for iteration. It. uses a ____ methodology which relies on identifying and catering for ____ during the analysis and planning stages. Client interaction is mainly in the analysis state when the ____ are specified. If something ____ occurs it is very ____ to change the direction of the ____.
0%
Agile versus Iterative
共享
共享
共享
由
Gw09brucejennif
KS5
Computing
Software Development Lifecycle
编辑内容
打印
嵌入
更多
作业
排行榜
显示更多
显示更少
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
完成句子
是一个开放式模板。它不会为排行榜生成分数。
需要登录
视觉风格
字体
需要订阅
选项
切换模板
显示所有
播放活动时将显示更多格式。
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?