1) 1. What is the cyde of Al projects primary objective? a) To create complex Al models quickly. b) To simplify the process of converting problems from the actual world into code c) To provide a structured framework for managing Al projects. d) To reduce the cost of developing Al-based remedies. 2) What is the initial stage of an Al project's lifecycle? a) Outlining the technology specifications for the Al model. b) Converting the real-world problem into an Al job with precise definitions c) Compiling and preparing the data required for the Al model's training. d) Selecting the Al algorithm that works best for the given job. 3) Which of the following metrics may be produced from a confusion matrix? a) Execution time and Memory usage b) Recall Precision, Accuracy, and F1 Score c) Learning rate and Batch size d) Data acquisition and Data cleaning 4) What is the primary purpose of the confusion matrix while evaluating an Al model? a) To measure the execution time of the model b) To identify the best algorithm for the model c) To measure the performance of an Al model using the test data d) To optimize the hyper parameters of the model 5) Problem scoping means selecting a problem and finding a solution for it using Al technology a) true b) false 6) Evaluation is a process that critically examines a program. a) true b) false 7) The deployment phase of the Al project cycle involves integrating the model into the production environment and does not require any further monitoring a) true b) False
0%
Ai project cycle class 9
共享
共享
共享
由
29111980winter
Class 9
Computer
编辑内容
打印
嵌入
更多
作业
排行榜
显示更多
显示更少
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
随堂测验
是一个开放式模板。它不会为排行榜生成分数。
需要登录
视觉风格
字体
需要订阅
选项
切换模板
显示所有
播放活动时将显示更多格式。
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?