What is the 1st step in the 5S process?, Standardized, Sort, Sweep, Sustain, Thick dark line use to show outline of object, visible edges, and surfaces., Vissible line, Hidden line, Construction line, Dimension line, Very light and thin line use to construct layout work., Construction lonr, Dimension line, Visible line, Hidden line, Short dash lines use to show nonvisible surfaces. Usually shows as medium thickness., Dimension line, Hidden line, Leader line, Section line, Medium line with arrowhead to show notes or label for size or special information about a feature., Construction line, Leader line, Section line, Visiblle line
0%
Technical Drafting 7
Podeli
Podeli
autor
Johnny78
Uredi sadržaj
Odštampaj
Ugradi
Više
Zadatke
Tabela
Prikaži više
Prikaži manje
Ova tabela je trenutno privatna. Kliknite na
Podeli
da biste je objavili.
Pristup tabeli je onemogućio vlasnik sredstva.
Ova tabela je onemogućena pošto Vam se podešavanja razlikuju od podešavanja vlasnika sredstva.
Vrati podešavanja
Kviz
je otvoreni šablon. On ne generiše rezultate za tabelu rangiranja.
Prijava je obavezna
Vizuelni stil
Fontove
Potrebna je pretplata
Postavke
Promeni šablon
Prikaži sve
Otvoreni rezultati
Kopiraj vezu
QR kôd
Izbriši
Vrati automatski sačuvano:
?